TLC-Logo

Manual J, S and D Reports in Austin, TX

Manual J, S, and D reports are required for compliance with the IECC Building Code on all new construction and additions.

TLC partners with certified HVAC design specialists to deliver accurate, code-compliant reports in 2 to 7 business days, completely online.

Submit your project today and keep your build on schedule.

  • 100% Online
  • 2-7 Day Turnaround
  • 100% Satisfaction Guaranteed
Request Online
0+
Reports delivered
0+
RESchecks completed
0
.9 rating
Based on 2,000+ reviews

What’s included with Manual J, S & D reports

Manual J report pages with residential heating and cooling load calculations.

Manual J Load Calculations

Size your HVAC system with precise load calculations that ensure maximum comfort and efficiency.

Stack of Manual S report pages listing selected HVAC equipment and specifications.

Manual S Equipment Selection

Pick the right equipment the first time with a code-compliant selection report that matches your system to your calculated load.

Residential floor plan with colored HVAC duct-routing lines across the rooms.

Manual D Duct Design

Deliver consistent airflow and even temperatures to every room with efficient duct systems.

Printed residential energy-code pages with a table and highlighted passages.

Texas Energy Code Compliance

Meet Texas-specific energy code requirements for residential and commercial buildings without the guesswork.

Stacked REScheck report pages with energy-efficiency calculations and building-envelope tables.

REScheck Compliance Reports

Sail through permit approval and code compliance with an accurate REScheck report.

Our Pricing

Manual J and S Report

$370
  • Includes load calculation and equipment selection report
  • Delivered via email in 2–7 business days
  • $100 for each additional system
Request Online

Manual J, S & D Reports

$520
  • Includes load calculation, equipment selection, and duct design
  • Delivered via email in 2–7 business days
  • $150 for each additional system
Request Online

Terms and conditions apply. Pricing valid up to 2,000 sq ft. Additional fees apply for larger properties or multiple systems. Complete request form for an exact quote.

Here’s how it works

Manual J, S, and D reports are required for mechanical system design compliance with the IECC Building Code for residential homes and commercial buildings.

Preparing accurate, code-compliant reports requires specialized ACCA-approved software and certified specialists. It’s why TLC partners with Scott Home Services, an industry leader in HVAC design, to fulfill every report.

All you need is your plans and a few project details. We handle the rest.

Our 5-Step Online Process

Submit Your Project

Complete our request form and attach your floor plans, insulation specs, and project address.

Review Submission

Certified specialists review your plans and follow up with any questions.

Calculate Load

Your Manual J is prepared using ACCA-approved software by certified HERS Raters and Manual J/S/D specialists.

Finalize Equipment & Duct Design

Manual S equipment selection and Manual D duct design are completed.

Report Delivery In 2-7 Days

Your full, permit-ready report package is delivered via email.

Frequently Asked Questions

Manual J, S, and D are the three ACCA-standard reports required for residential HVAC system design. Manual J calculates your home’s heating and cooling load. Manual S confirms your equipment is properly sized for that load. Manual D designs the duct system for balanced airflow throughout. Together, they ensure your mechanical system is code-compliant and permit-ready.

Manual J and S are required for all new construction and additions under the 2009 IECC and later. Manual D is required for duct systems. Most municipalities require submission during the permit application, though some require it before the rough framing inspection.

Most reports are completed within 2 to 7 business days. Providing complete plans and specs upfront helps keep the timeline on track. If we have questions, we’ll follow up directly.

Yes. Texas enforces the 2015 IECC for residential construction, which requires Manual J, S, and D for all new construction and additions. Texas also has specific requirements around blower door testing, duct leakage testing, and window SHGC values that vary by municipality. Builders across Austin, Round Rock, San Marcos, and Waco must meet these standards before permit approval.

We’ll need your floor plans, project address, insulation levels, window and door specs, and HVAC equipment details if selected. If equipment hasn’t been chosen yet, we can complete the Manual J first and finalize the S and D once equipment is confirmed.

TLC partners with Scott Home Services, an industry leader in HVAC design. The company has certified HERS Raters and Manual J/S/D specialists using ACCA-approved software.